Assignment Deadline Planner

Weekdays you never get to this

One date per line or separated by commas, written as year-month-day.

Days you can actually work

15 days

Out of 15 days on the calendar, ending Sun 13 Dec 2026.

  • Stage 1 · 25% doneWed 2 Dec 2026 · 4 working days
  • Stage 2 · 50% doneSun 6 Dec 2026 · 4 working days
  • Stage 3 · 75% doneThu 10 Dec 2026 · 4 working days
  • Stage 4 · 100% doneSun 13 Dec 2026 · 3 working days
Calendar span15 days
Gone to weekdays you ticked0 days
Gone to dates you listed0 days

Both ends are counted: the day you start and the day it is due are days you can work on it. If the deadline is nine in the morning, tick the due date itself as a day you are busy and the count drops by one. Everything above is division of the days you told it about, with no assumption about how long any part of the work takes — that estimate is yours to make, and the stages are only there to tell you the date by which each slice of it has to be behind you.

How the Assignment Deadline Planner Dates Each Stage of the Work

The window runs from the start date to the due date with both ends included, stepped forward one calendar day at a time in UTC so that a clock change in the middle of it cannot shorten a day. Each day then goes on exactly one of three piles: a weekday you ticked, a date you listed as busy, or a day you can work. A listed date that also falls on a ticked weekday is filed under the weekday alone, which is why the three figures beneath the plan always add back to the calendar span.

The working days are then shared between the stages as evenly as whole days allow, with any remainder handed out one day apiece to the earliest stages. Each stage is dated on the last working day it holds, counted along the list of working days rather than along the calendar, so a stage can never end on a weekday you ticked or a date you blocked. The final stage therefore lands on the last working day in the window, which is the due date only when the due date itself is free.

Stage labels round the fraction to a whole per cent, so three stages read 33%, 67% and 100% rather than a recurring decimal.

Scope: this counts and divides whole days between two dates, and nothing finer. It has no notion of hours, so a nine o’clock deadline or a free afternoon counts as a full day unless you block it; it carries no public holidays or term dates; and it makes no estimate of how long any part of the work takes, so each stage is an equal share of the days, not of the effort. Dates must be typed as year-month-day, anything else on the busy list is named and ignored, a window longer than 1,100 days is refused as a likely mistyped year, and a due date before the start is reported as overdue rather than planned.

Calendar span
span = (due − start) in days + 1
Where each day in the span goes
weekday ticked        → gone to weekdays
date listed as busy   → gone to dates
otherwise             → a working day, W = how many
Days in each stage
base  = floor(W ÷ n)
extra = W − base × n
stage i holds base + 1 if i ≤ extra, otherwise base
Date each stage is due
used(i) = days held by stages 1 to i
date(i) = the used(i)-th working day in the window
Stage label
Stage i · round(i ÷ n × 100)% done
When there is no ordinary plan
due before start  → overdue by (start − due) days
W = 0             → every day is unavailable, no plan
W < n             → warning: some stages share a date
W
the working days left once ticked weekdays and listed dates are taken out
n
the number of stages chosen, from two to six
span
calendar days from start to due date, counting both
floor
the whole number of days, rounded down

Three hand-ins worked back from fixed dates

Start on a Monday with the piece due a fortnight later, count both ends, and the calendar span is fourteen days. Tick Saturday and Sunday as days you never work and four of them come off immediately, leaving ten. Split that into four stages and the legs come out as three days, three days, two days and two days: a quarter of the work behind you by the third working day, half by the sixth, three quarters by the eighth.

The leftover days go to the earliest legs rather than the last ones, which is deliberate. Work pulled forward becomes slack at the end, and slack at the end is the only thing that survives contact with a printer that will not print.

The second row lists three busy dates but loses only two to them. Sunday 18 October is already a ticked weekday, so it is counted once, against the weekday. Fifteen working days split three ways gives five a stage with nothing left over, and because Saturdays were left free the middle stage falls due on Saturday 17 October.

The third is a single week with two days already spoken for and five stages asked of it. Three working days cannot hold five stages, so stages four and five hold no day of their own and share Friday 18 December with stage three, which is the point at which the planner warns that the piece has become one sitting.

As the planner prints them, with both ends of each window counted
Window, stages and days offDays you can actually workGone to weekdays you tickedGone to dates you listedStage 1Final stage
17–30 Aug 2026 · 4 stages · weekends off10 days4 days0 daysWed 19 Aug 2026 · 3 working daysFri 28 Aug 2026 · 2 working days
5–23 Oct 2026 · 3 stages · Sundays off · busy 10, 14 and 18 Oct15 days2 days2 daysFri 9 Oct 2026 · 5 working daysFri 23 Oct 2026 · 5 working days
14–18 Dec 2026 · 5 stages · busy 15 and 16 Dec3 days0 days2 daysMon 14 Dec 2026 · 1 working dayFri 18 Dec 2026 · 0 working days

Ten days to a deadline is rarely ten days

A calendar tells you how far away the due date is. It does not tell you how much of that distance you can use, and those are different numbers by a wide margin. Between here and a Friday deadline there may be two shifts at work, a match on Saturday, and a Sunday you have never once opened a laptop on. This planner asks which of the intervening days are genuinely yours, subtracts the rest, and only then divides what is left into stages.

Where the days went, itemised

Three figures are shown beneath the plan and they always add back to the calendar span: the days lost to weekdays you never study on, the days lost to specific dates you blocked out, and the days you are actually left with. A date that falls on a weekday you already excluded is counted once, against the weekday, so nothing is deducted twice.

Both ends of the window count as usable. The day you begin is a day you can work, and so is the due date itself. If the hand-in is nine in the morning, add that date to the blocked list and the count drops by one, which is more honest than the tool guessing at what time of day a deadline falls.

When the honest answer is that there is no plan

Three situations get a plain sentence instead of a schedule. A due date already in the past returns how many days ago it went, because dividing remaining work across negative time produces nonsense that looks like arithmetic. A window in which every single day has been excluded says so rather than dividing by zero. And a window with fewer working days than stages warns that at least one stage has no day of its own, which is the tool telling you the piece is now a single sitting rather than a project.

What you will not find is a template claiming that an essay is thirty per cent reading and fifteen per cent proofreading. No such split exists as a fact about writing, so the stages here are fractions of the work rather than named phases, and deciding what counts as half done stays with the person who knows the assignment.

Reading the plan without flinching

The point of a backwards plan is that it fails early. A schedule built forwards from today feels comfortable until the last week, when the arithmetic finally catches up; one built backwards from the deadline puts the bad news in front of you on day one, while there is still time to negotiate an extension, drop a section, or clear a weekend.

So the number to watch is not the finishing date, which is fixed and was never in question. It is the date on the first stage. If a quarter of the work has to be finished by Thursday and Thursday is tomorrow, that is the tool telling you something about the size of the piece rather than about your character, and it is telling you now instead of on the last night.

Holidays, stages, and the day it is due

Why is the due date treated as a day I can work?

Because for most hand-ins it genuinely is one: a midnight submission leaves the whole day available. Where the deadline falls early in the morning, block that date out and the count corrects itself, which beats the tool assuming a time it cannot know.

Can it skip public holidays for me?

No, and it does not pretend to. Holidays differ by country, region and year, and a built-in list quietly rots the moment it ships. Blocking the dates yourself takes a few seconds and is right for where you actually are.

Why are the stages just percentages rather than research, drafting and editing?

Because the proportions would be invented. A lab report, a translation and a dissertation chapter divide their effort in wildly different ways, and a number picked to look plausible would be guesswork with a percentage sign attached to it.

What happens if I block out more days than I have?

The plan stops and explains, rather than returning zero days a stage or an infinite daily workload. Blocking every day in the window is a real thing to type, and a tool that answered it with a division by zero would deserve none of your trust.